About Keii

Development Path
  • 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012
  • 2011
  • 2010
  • 2009
  • 2008
  • 2007
  • 2006
  • 2005
  • 2004
  • 2003
January 2017, to participate in the South Power Grid Co., Ltd. ultra-high voltage transmission company Baise Bureau, Wuzhou Bureau SF6 gas refrigeration infrared leak detector GL800 procurement tender and part of the successful bidder;
2017 in February, to participate in the Southern Power Grid Co., Ltd. ultra-high voltage transmission company in 2015 the first batch of technical transformation, overhaul, science and technology, information technology and part of the tender;
2017 in May, to participate in the South Power Grid Co., Ltd. ultra-high voltage transmission company in northwest Yunnan to Guangdong UHV DC transmission project by the end of the East converter station new project hall infrared infrared temperature measurement system and part of the bid;
2017 in June, to participate in the network of Inner Mongolia Eastern Electric Power Maintenance Co., Ltd. Mengdong, Chifeng, Xing'an, Hulunbeier and Tongliao maintenance company safety supervision and control equipment (four-axis unmanned aerial vehicle) line inspection robot tender and part of the successful bidder.

January 2016, to participate in the Guangzhou City research and development institutions to build special projects, and passed the review;
2016, was identified as three confidential enterprises;
2016, was identified as the development zone of intellectual property advantages of enterprises


April 2015, to participate in Shandong Luneng Intelligent Technology Co., Ltd. infrared thermal imager procurement tender and part of the successful bidder;
May 2015, to participate in China Southern Power Grid Co., Ltd. ultra-high voltage transmission company in 2015 the first batch of technical transformation, overhaul, technology, information technology and some of the successful bidder;
July 2015, to participate in the Yunnan power grid and the South network main network Luxi back to back DC asynchronous networking project - infrared on-line temperature measurement system tender and part of the successful bidder;
November 2015, to participate in the Yunnan power grid and the South network main network Luxi back to back DC asynchronous networking project, Yunnan Yongren to Funing DC transmission by the end of 500kV exchange supporting two projects tender items and part of the successful bidder.

July 2014, to participate in the State Grid fixed assets retail sales in 2014 the second batch of tender (UAV, substation intelligent inspection robot) project and part of the successful bidder;
July 2014, to participate in the State Grid Corporation of auxiliary materials in 2014 the second batch of tender and part of the successful bidder;
In 2014, to participate in the State Grid Zhejiang Electric Power Company in 2014 the fourth batch of equipment, materials, tender procurement projects and the successful bidder.


In 2013, it was officially awarded the honorary title of "Gazelle Enterprise" by Guangzhou Economic and Technological Development Zone, and became one of the key infrared enterprises cultivated in Guangdong Province.


January 2012, with "sulfur hexafluoride (SF6) non-refrigerated infrared gas leak detection imager" project, and South China Normal University signed a production and research cooperation project, the project successfully applied for the Guangdong Province production and research projects, and Received 300,000 yuan funding.
May 2011, to participate in the State Grid Corporation of Hubei Province in 2010 the first batch of power companies in the main technical transformation projects and part of the successful bidder;
July 2011, passed the Guangdong Province (Guangdong Provincial Science and Technology Office) "high-tech enterprises" annual review;
In August 2011, to the Shanxi UHV Changzhi Station, UHV Nanyang station to provide batch infrared monitoring equipment, and participate in system integration work;
December 2011, to participate in the State Grid Corporation of Hubei Province Electric Power Company 11 cross-district zero purchase Hubei UHV substation exchange part of the project and part of the successful bidder.
January 2010, hand-held infrared thermal imager KC800 to complete research and development and market;
March 2010, with "helicopter inspection technology research" project, and the Guangzhou Municipal Science and Technology and Information Technology Bureau signed a Ministry of Science and Technology SME Technology Innovation Fund project contract, and the city recommended, and the Ministry of Science and Technology of small Enterprise Technology Innovation Fund Management Center signed a "small and medium-sized technology innovation fund funded projects," received a total of 1.55 million yuan funding;
June 2010, by virtue of "distribution network car mobile detection system", and the Guangzhou Development Zone Science and Technology Bureau signed a "science and technology project task book", and received 500,000 yuan funding;
December 2010, to participate in the State Grid Corporation of Chengdu Electric Power Bureau production preparation fee to purchase infrared imager project and part of the successful bidder.
January 2009, hand-held infrared thermal imager KC300, KC500, KC700 completed R & D and market;
In December 2009, the registered capital increased to RMB 5 million;
December 2009, passed the ISO9001 quality system certification.

December 2008, commissioned by the State Grid Corporation, the development of "helicopter power line inspection system";
December 2008, access to national "high-tech enterprises" that certificate.


In March 2007, fixed monitoring infrared camera KC200 completed the development and market;

In April 2006, the office moved to Guangzhou Hi-tech Industrial Development Zone Science City;
April 2006, by virtue of "industrial production process control with uncooled infrared focal plane thermal imaging system", and the Guangzhou Municipal Science and Technology and Information Technology Bureau signed the Ministry of Science and Technology SME Technology Innovation Fund project project contract, access to funding 35 million Yuan
July 2006, the first independent research and development products infrared thermal imager KC100 completed R & D and market.


In February 2005, the establishment of a wholly owned subsidiary of "Guangzhou challenge Software Co., Ltd.", the overall responsibility for research and development company's products supporting software; March 2005, began a comprehensive research and development "industrial production process control with uncooled infrared focal plane thermal imaging System "; in June 2005, access to the Guangzhou Municipal Science and Technology Bureau awarded the" high-tech enterprises that certificate. "
March 2004, the smooth development of Bangladesh agents, the establishment of agency relations.
In October 2003, the company set up and stationed in Guangzhou City students Pioneering Park; in September 2003, access to international entrepreneurship funding; October 2003, the smooth development of Thai agents, Taiwan agents and agents in Australia, to establish agency relations.
Quote Now
Your Name *
Your Email *
Your Country *
Your Message *